|
|
Sector Wise Services |
|
|
Services Sector |
|
|
|
|
|
Water Supply and Distribution |
|
|
Detailed Project Report (DPR) for Augmentation of Water Supply System for Faridabad (Haryana State) under Jawaharlal Nehru National Urban Renewal Mission (JNNURM) Scheme. |
|
Pharmacity at Parawada, Vishakapatnam, Andhra Pradesh |
|
Urban Infrastructure Improvement (Water Supply, Sanitation, Drains & Roads) in Selected Urban slums of Warangal Town in Andhra Pradesh (16 urban slums & associated infrastructure Development)-assisted by DFID, Govt of U.K. |
|
Detailed Project Report (Water Supply, Sewerage, Storm water & Fire Fighting systems) for, Vishakapatnam (New industrial city over 865 Hectares) on commercial format Scope of work also included Environmental Evaluation of Pharma City Development (Private sector investments with equity participation from State Government) |
|
|
Top » |
|
Sewerage / Drainage / Sewage Treatment / reuse of treated water |
|
|
Detailed Project Report (DPR) for Revamping / Rehabilitation, Strengthening and Improvement of Existing Sewerage System in Faridabad City, Haryana State under Jawaharlal Nehru National Urban Renewal Mission (JNNURM) Scheme. |
|
Detailed Project Report (DPR) for Implementation of Sewerage and Drainage schemes for Agartala City in Tripura State under Jawaharlal Nehru National Urban Renewal Mission (JNNURM) Scheme |
|
Detailed Project Report (DPR) for Revamping / Rehabilitation, Strengthening and Improvement of Existing Sewerage System in Gangtok city in Sikkim as per NRCD guidelines, Ministry of Environment & Forests, Govt. of India |
|
Preparation of River Bank Sanitation Scheme through providing Sewerage & Sewage Treatment facilities at Agartala City for conservation of Haora River water quality as per NRCD guidelines, Ministry of Environment & Forests, Govt. of India (Entire City of 18 sq. kms.) |
|
Detailed Project Report (DPR) for Sewerage and Sewage Master Plan in KDHeaslong town including advisory services during project implementation & commissioning in Ranchi district of Jharkhand (Formerly Bihar) (STP of 3mld Capacity)- assisted by World Bank |
|
Detailed Project Report (DPR) for Sewerage and Sewage Master Plan in Parej East town including advisory services during project implementation & commissioning in Hazaribagh district of Jharkhand (formerly Bihar) (STP of 2mld Capacity)- assisted by World Bank |
|
Detailed Project Report (DPR) for Implementation of Sewerage and Drainage schemes for Bagalkote Town in Karnataka as per NRCD guidelines, Ministry of Environment & Forests, Govt. of India |
|
Detailed Project Report (DPR) for Implementation of Sewerage and Drainage schemes for Kohima City in Nagaland as per CPHEEO guidelines, Ministry of Urban Development, Govt. of India |
|
Master Plan Development for Sri Mayapur Dham (town ship) in West Bengal (Entire Temple Township)-Evaluation of Sewage Treatment options upto year 2030 and Design & Detailed Engineering of Sewage Treatment Plant for the year 2005 |
|
Urban Infrastructure Improvement (Water Supply, Sanitation, Drains & Roads) in Selected Urban slums of Warangal Town in Andhra Pradesh (16 urban slums & associated infrastructure Development)-assisted by DFID, Govt of U.K. |
|
Detailed Project Report (Water Supply, Sewerage, Storm water & Fire Fighting systems) for , Vishakapatnam (New industrial city over 865 Hectares) on commercial format Scope of work also included Environmental Evaluation of Pharma City Development (Private sector investments with equity participation from State Government) |
|
Preparation of Drainage Master Plan and Relocation of Utilities for Development of Safdarjung Intersection at Ring Road and Aurobindo Marg, New Delhi |
|
Urban Infrastructure Development Schemes for River Pollution abatement schemes (Waste water treatment, Solid waste management, Sewage treatment) for Bokaro & Kargali towns in Bihar under Damodar River Action Plan as per the guidelines of NRCD Ministry of Environment & Forests, Govt. of India |
|
Urban Infrastructure Development Schemes for River Pollution abatement schemes (Waste water treatment, Solid waste management, Sewage treatment) for Ramgarh town in Bihar under Damodar River Action Plan as per the guidelines of NRCD Ministry of Environment & Forests, Govt. of India |
|
Urban Infrastructure Development Schemes for River Pollution abatement (Waste water treatment, Solid waste management, Sewage treatment) for Sudamdih town in Bihar under Damodar River Action Plan as per the guidelines of NRCD Ministry of Environment & Forests, Govt. of India |
|
Urban Infrastructure Improvement Project comprising Topographical Survey, Population projections, Preparation of Ward wise population density maps, Formulation of Sewerage and Drainage schemes and Engineering designs, Contract Documents for Zone A (Phase - I) area of Jammu City in Jammu & Kashmir as per NRCD guidelines, Ministry of Environment & Forests, Govt. of India |
|
Urban Infrastructure Improvement Project comprising, Formulation of Sewerage and Drainage schemes and Engineering designs, Contract Documents for the entire master plan area etc. of Katra Town in Jammu & Kashmir as per NRCD guidelines, Ministry of Environment & Forests, Govt. of India |
|
|
Top » |
|
Solid Waste Management |
|
|
Detailed Project Report (DPR) for Solid Waste Management schemes including Engineering designs, Contract Documents for the entire master plan area etc. for Ministry of Urban Development approval and Preparation of Construction drawings, Construction supervision upto implementation & commissioning for Jodhpur City in Rajasthan as per CPHEEO guidelines, under ("Centrally Sponsored Scheme for Mitigation of Bird Hit Menace for selected 10 Airfield towns across India, by Ministry of Urban Department, Govt. of India") |
|
Detailed Project Report (DPR) for Solid Waste Management schemes including Engineering designs, Contract Documents for the entire master plan area etc. for Ministry of Urban Development approval and Preparation of Construction drawings, Construction supervision upto implementation & commissioning for Sirsa in Haryana as per CPHEEO guidelines, under ("Centrally Sponsored Scheme for Mitigation of Bird Hit Menace for selected 10 Airfield towns across India, by Ministry of Urban Department, Govt. of India") |
|
Detailed Project Report (DPR) for Solid Waste Management schemes including Engineering designs, Contract Documents for the entire master plan area etc. for Ministry of Urban Development approval and Preparation of Construction drawings, Construction supervision upto implementation & commissioning for Ambala in Haryana as per CPHEEO guidelines, under ("Centrally Sponsored Scheme for Mitigation of Bird Hit Menace for selected 10 Airfield towns across India, by Ministry of Urban Department, Govt. of India") |
|
Detailed Project Report (DPR) for Solid Waste Management schemes including Engineering designs, Contract Documents for the entire master plan area etc. for Ministry of Urban Development approval and Preparation of Construction drawings, Construction supervision upto implementation & commissioning for Dimapur City in Nagaland as per CPHEEO guidelines, Ministry of Urban Development, Govt. of India |
|
Detailed Project Report (DPR) for Solid Waste Management schemes including Engineering designs, Contract Documents for the entire master plan area etc. for Ministry of Urban Development approval and Preparation of Construction drawings, Construction supervision upto implementation & commissioning for Kohima City in Nagaland as per CPHEEO guidelines, Ministry of Urban Development, Govt. of India |
|
Detailed Project Report (DPR) for Solid Waste Management schemes including Engineering designs, Contract Documents for the entire master plan area etc. for Ministry of Urban Development approval and Preparation of Construction drawings, Construction supervision upto implementation & commissioning for Imphal in Manipur as per CPHEEO guidelines, Ministry of Urban Development, Govt. of India |
|
Project Implementation Support Services for Solid Waste Management schemes including Engineering designs, Contract Documents for the entire master plan area etc. for Ministry of Urban Development approval and Preparation of Construction drawings, Support Services upto implementation & commissioning for Imphal in Manipur as per CPHEEO guidelines, Ministry of Urban Development, Govt. of India |
|
|
Top » |
|
Rural Roads and Infrastructure Development |
|
|
Independent Review of 80 DPR’s of Rural Roads (643 km) under PMGSY, randomly selected from 8 States (10 DPRs/State) prepared by SRRDAs at State level and submitted to NRRDA for approval under World Bank Assistance. States covered are Himachal Pradesh, Uttarakhand, Punjab, Rajasthan, Uttar Pradesh, Bihar, Jharkhand and Meghalaya. |
|
Detailed Project Report for rural roads in West Tripura District (260 kms of road length- Phase I) under the Prime Ministers Gram Sadak Yojana (PMGSY) comprising Topographical Survey, Traffic Survey, Environmental Evaluation Studies, Geotechnical Investigations, Engineering drawings, Bill of Quantities etc. for NRRDA approval and Preparation of Construction drawings, Construction supervision upto implementation & commissioning |
|
Detailed Project Report for rural roads (Up-Gradation Roads) in West Tripura District (231 kms of road length- Phase II) under the Prime Ministers Gram Sadak Yojana (PMGSY) comprising Topographical Survey, Traffic Survey, Environmental Evaluation Studies, Geotechnical Investigations, Engineering drawings, Bill of Quantities etc. for NRRDA approval and Preparation of Construction drawings, Construction supervision upto implementation & commissioning |
|
Detailed Project Report for rural roads (New Connectivity Roads) in West Tripura District (194 kms of road length- Phase II) under the Prime Ministers Gram Sadak Yojana (PMGSY) comprising Topographical Survey, Traffic Survey, Environmental Evaluation Studies, Geotechnical Investigations, Engineering drawings, Bill of Quantities etc. for NRRDA approval and Preparation of Construction drawings, Construction supervision upto implementation & commissioning |
|
Environmental Impact Assessment Studies of rural roads in West Bengal, Assam and Orissa (3000 km of roads @ 1000 kms /state) under the Prime Ministers Gram Sadak Yojana(PMGSY) funded by Asian Development Bank |
|
Environmental Impact Assessment Studies of rural roads in Madhya Pradesh & Chattisgarh (1000 kms of roads @ 500 kms/state) under the Prime Ministers Gram Sadak Yojana(PMGSY) funded by Asian Development Bank |
|
|
Top » |
|
EIA / SIA Studies for Infrastructure Projects |
|
|
Environmental and Social Impact Assessment (ESIA) for 2000 kms of State Road Network under HPSRTP for HPRIDCL, Govt. of Himachal Pradesh under funding assistance of the World Bank. |
|
Environmental and Social Safeguards Implementation Monitoring and Audit (ESMEA) for 4825 km of Rural Roads in Andhra Pradesh under APRRP, Govt. of Andhra Pradesh, funded by AIIB. |
|
Environment and Social Review for Infrastructure Development Projects presently under implementation through BOT / PPP mode under Processing and Capacity Development for Infrastructure Projects under ADB TA - 5 Separate Contracts |
|
Advisory Services as Environment Specialist, Karnataka State Highways Improvement Project (Phase II) for about 1964km (under consideration for funding by The World Bank) |
|
Environmental Impact Assessment Studies of rural roads in West Bengal, Assam and Orissa (3000 km of roads @ 1000 kms /state) under the Prime Ministers Gram Sadak Yojana(PMGSY) funded by Asian Development Bank |
|
Environmental Impact Assessment Studies of rural roads in Madhya Pradesh & Chattisgarh (1000 kms of roads @ 500 kms/state) under the Prime Ministers Gram Sadak Yojana(PMGSY) funded by Asian Development Bank |
|
Environmental Impact Assessment studies for widening and improvement of NH- 7 section between Anantpur to Karnataka Border in Andhra Pradesh - funding assistance by Asian Development Bank |
|
Environmental & Social Impact Assessment Studies for Widening and improvement of State Highways all over Uttar Pradesh (2655 km) under the State Highways Improvement Project- funding assistance by World Bank |
|
Environmental Impact Assessment for improvement of State Highways (SH10 and SH1) connecting to NH34 between (Km 31-398) under West Bengal North South Corridor Project in West Bengal funded by Asian Development Bank |
|
Environmental & Social Impact Assessment of Up-gradation, Rehabilitation & Development of NH- 4 (Tumkur-Harihar Section) in Karnataka under National Golden Quadrangle Project funded by Asian Development Bank |
|
Environmental and Social Impact Assessment Studies for Up-gradation/ Improvement works of Indore-Khalghat section of NH-3 in Madhya Pradesh (Under consideration for funding by the World Bank) |
|
Environmental Impact Assessment Studies for widening & improvement of NH 34 (Barasat- Raiganj section) under West Bengal North- South Corridor project Improvement Project (365 kms.) under funding assistance of Asian Development Bank |
|
Evaluation of Contamination of Bhoj wetland (Upper & Lower lakes of Bhopal) and Environmental Impact Assessment Studies for the Dredging & De-silting component of Bhoj wetland (Upper & Lower lakes of Bhopal) - funded by JBIC (formerly OECF) of Japan |
|
Environmental Impact Assessment of Development of Marine Terminal facilities to handle hazardous chemicals , off the coast of Tamilnadu-partly funded by IFC, World Bank |
|
Environmental Impact Assessment for Development of Gangavaram Port in Andhra Pradesh (Private sector investments with equity participation from Govt. of Andhra Pradesh) |
|
Environmental Impact Assessment for hydrocarbon exploration programme for Ganga Valley Project (Kashipur PEL Area) in Rampur district of Uttar Pradesh |
|
Independent Supervision Consultancy for Review of Environmental and Social Impact Assessment Reports of up-gradation/improvement to three Sections of National Highways in the States of Maharashtra, Karnataka and Andhra Pradesh |
|
Environmental and Social Impact Assessment for widening and improvement of Bangalore - Salem Section of NH- 7 in Tamil Nadu |
|
|
|
|
Environmental & Social Safeguard Due Diligence for Infrastructure Projects |
|
|
|
Environmental and Social Safeguard Implementation Monitoring & Audit (ESMEA) for 4825 km of Rural Roads in Andhra Pradesh under APRRP, Govt. of Andhra Pradesh, funded by AIIB. |
|
Strengthening and Widening of NH -3 Section between Indore and Khalghat in Madhya Pradesh |
|
Improvement and Widening of existing 2 Lane to 4 Lane Ahmedabad Ring Road Around Ahmedabad City in Gujarat |
|
Widening and Up-gradation of NH 45 section between Padalur to Trichy in Tamil Nadu |
|
Strengthening and Widening of NH-6 Section between Kondhali and Talegaon in Maharashtra |
|
Widening and Up-gradation of NH-6 Section between Nagpur and Kondhali in Maharashtra |
|
Four Laning of NH -6 Section between Raipur and Auran in Chattisgarh |
|
Widening and Up-gradation of NH -67 Section between Thanjavur and Trichy in Tamil Nadu |
|
Teesta-III (1200 MW) Hydro Electric Project in North Sikkim District, Sikkim |
|
Widening and Up-gradation of NH -8 Section between Vadodara and Bharuch in Gujarat |
|
Strengthening and Widening of NH -2 Section between Orai and Bhognipur in Uttar Pradesh |
|
Widening and Up-gradation of NH 45 section between Ulundurpet to Padalur in Tamil Nadu |
|
Widening and Up-gradation of NH -7 Section between Omallur to Namakkal in Tamil Nadu |
|
Widening and Up-gradation of NH 45 section between Tindivanam to Ulundurpet in Tamil Nadu |
|
Widening and Up-gradation of NH -7 Section between Jadcherla and Kothakota in Andhra Pradesh |
|
Widening and Up-gradation of NH -11 Section between Agra in Uttar Pradesh and Bharatpur in Rajasthan |
|
Widening and Up-gradation of NH-24 Section between Lucknow and Sitapur in Uttar Pradesh |
|
Widening and Up-gradation of NH 47 section between Salem to Kumarapalyam in Tamil Nadu |
|
Widening and Up-gradation of NH 47 section between Kumarapalyam to Chengapalli in Tamil Nadu |
|
Widening and Up-gradation of NH-7 section between Namakkal to Karur in Tamil Nadu |
|
Widening and Up-gradation of NH-7 section between Dindigul to Samayanallore in Tamil Nadu |
|
Widening and Up-gradation of NH-47 section between Thrissur to Angamali and Improvement, O&M of NH-47 between Angamali to Edapalli in Kerala |
|
Widening and Up-gradation of NH-14 section between Palanpur to Swaroopganj in Gujarat and Rajasthan |
|
Widening of NH68 section between Salem and Ulundurpet in Tamil Nadu (SU Toll Road Private Ltd.) |
|
Widening of NH45 section between Trichy and Dindigul in Tamil Nadu (TD Toll Road Private Limited) |
|
Widening of NH 45B section between Madurai and Tuticorin in Tamil Nadu (Madurai Tuticorin Tollways Ltd.) |
|
Widening of NH67 section between Trichy and Karur in Tamil Nadu (TK Toll Road Private Ltd) |
|
Widening of NH6 section between end of Durg Bypass (Km 322.4) to Chattisgarh/Maharashtra Border (Km 405) |
|
Widening of NH 6 section between Chattisgarh/Maharashtra Border (Km. 405) to Wainganga Bridge near Bhandara (Km 485) |
|
Modernization of Delhi and Mumbai Airports, Mumbai, Maharashtra |
|
|
|
Top » |
|
Independent Review Consultancy Services |
|
|
Independent review of Environmental Assessment of Andhra Pradesh Road Sector Project, in Andhra Pradesh (2096 kms under PCC, 1234 kms under PPP and 6400 kms under LTPBMC) - World Bank Assisted |
|
Independent review of Environmental Assessment of Himachal Pradesh State Road Project, in Himachal Pradesh - 1675kms and 9500 metres of Tunnels - World Bank Assisted |
|
|
Top » |
|
Modernization / Redevelopment of Cremation Grounds |
|
|
Detailed Project Report (DPR) for CNG Fired Crematorium at Agartala, Tripura including Preparation of Construction drawings, project implementation support services upto commissioning |
|
Detailed Project Report (DPR) for Electric Crematorium at Shillong, Meghalaya including Preparation of Construction drawings, project implementation support services upto commissioning |
|
Carrying out Situational Analysis Survey of all Cremation Grounds within NCT of Delhi (1400 sqkm), preparation of Master Plan (3 stages) for development of Cremation Grounds, Detailed Project Report (DPR) for Pilot / Model Crematorium / Cremation Ground, preparation of tender documents for Pilot CG and providing project implementation services upto commissioning of Pilot CG and preparation of Policy framework / guidelines for development of cremation grounds within NCT of Delhi under Yamuna Action Plan II assisted by NRCD, Ministry of Environment & Forest, Govt. of India and JBIC |
|
Detailed Project Report (DPR) for CNG Fired Pilot Cremation Ground at Green Park Extn., New Delhi |
|
|
Top » |
|
|
|
|
|